Hungary's Central Statistical Office (KSH) published its September construction figures on 13 November 2026 (KSH flash report, Hungarian). Construction output volume was 5.6% lower than in September 2025 and 9.9% lower than in August, after seasonal and working-day adjustment. August had shown a corrected 19.7% annual increase, so September reversed part of that jump (Telex, Hungarian).

For readers following Hungarian property, two numbers stand out. Building construction grew, while the volume of newly signed contracts fell by 34.5%. This article walks through the breakdown, the housing background and the limits of the data.

Fact sheet
SourceKSH flash report: Construction, September 2026
Published13 November 2026
Output volume, year on year−5.6% (raw and working-day adjusted)
Output volume, month on month−9.9% (seasonally and working-day adjusted)
Buildings (structure group), year on year+5.3%
Civil engineering works, year on year−22.2%
New contracts volume, year on year−34.5%
Order book at end-September, year on year−14.0%
Output, January–Septemberunchanged on a year earlier
September output value, current pricesHUF 775.1 billion
Next release11 December 2026 (October data)

Buildings versus civil engineering

KSH publishes two breakdowns (KSH).

By type of structure, buildings grew 5.3% and civil engineering works fell 22.2%. Buildings include residential blocks, offices, halls and other above-ground work. Civil engineering covers mainly roads, railways and utilities.

By industry branch:

BranchChange, year on year
Construction of buildings+21.4%
Civil engineering−29.7%
of which roads and railways−20.9%
of which utility projects−28.0%
of which other civil engineering n.e.c.−79.9%
Specialised construction (largest branch)−9.9%

Sources: KSH, Telex.

The two breakdowns give different figures for buildings because one classifies what is being built, the other which kind of firm does the work. Specialised contractors, such as electrical, plumbing or finishing firms, work on both buildings and civil engineering projects.

New contracts and the order book

The volume of new contracts was 34.5% below the level of a year earlier. Contracts for buildings fell 22.7%, contracts for civil engineering works 43.6% (KSH).

The order book at the end of September was 14.0% smaller year on year. Within it, the stock of contracts for buildings was 2.1% larger, and for civil engineering 19.2% smaller.

The order book measures work already contracted but not yet done. For buildings it is slightly above last year's level, even as fresh orders shrink. Index, a Hungarian news site, headlined its report with the point that work for the coming months is running down (Index, Hungarian). That is a press reading, not a KSH finding.

Construction prices

The same release included third-quarter prices. In Q3 2026, construction producer prices were 5.5% higher on average than a year earlier and 0.9% higher than in Q2 (KSH).

Q3 2026, year on yearPrice change
Specialised construction+6.2%
Civil engineering works+5.4%
Buildings+4.4%

The volume figures already strip out these price effects. At current prices, September output was worth HUF 775.1 billion, and January–September output HUF 5,938.1 billion.

The housing background

The monthly construction report does not separate residential buildings. That comes from the quarterly KSH housing release, published on 4 November 2026 (KSH, Dwelling construction and building permits, Q1–Q3 2026, Hungarian):

  • In the first nine months of 2026, 9,803 new homes were completed, 31% more than a year earlier.
  • In Budapest, 3,998 homes were completed, up 59%.
  • Permits and simple notifications in Budapest covered 7,529 planned homes, 4.0% fewer than a year earlier.
  • Nationally, planned homes totalled 22,331, up 12% (Bank360, 4 November 2026, Hungarian).

Both datasets point the same way: building work is growing and completions have risen. One measures the volume of all building construction, the other counts dwellings, so neither can be derived from the other.

What the data does not show

  1. It is not a housing statistic. The buildings category includes offices, industrial and public buildings. The monthly data does not show the residential share.
  2. One month is not a trend. August was strong, September weak. Monthly figures swing, and KSH may revise earlier months.
  3. A contract is not output. New contract volumes relate to future work, but do not say when or at what pace it will be carried out.
  4. Volume, not value. The percentages are price-adjusted. Forint values move differently.
  5. Not a price forecast. Nothing in the construction data says how home prices or rents will move.

Summary

  • According to KSH, Hungarian construction output in September 2026 was 5.6% lower than a year earlier and 9.9% lower than in August.
  • Building construction grew (+5.3%), civil engineering fell (−22.2%).
  • New contracts were down 34.5% and the order book 14.0%, while the order book for buildings was up 2.1%.
  • October data is due on 11 December 2026.

Related reading: Blog archive.

Sources

Data Analytic Investments is not affiliated with the institutions or portals cited; names are used for identification only.

Educational content. Not investment advice.

Explore Topics

#construction#KSH#Hungary#building construction#housing construction#order book#construction prices#2026
D

Written by

Data Analytic Investments

Content creator and writer sharing insights and stories.

Share · Megosztás:XFacebookLinkedInWhatsAppTelegramE-mail